fbpx
Welcome to our Knowledge Base
< All Topics
Print

Production Planning Report

Report used to review the crew tonnes targets for each crew.

The working days are entered along with the Production Target with loads uplifted shown against the crew.

As soon a a load has the weight entered against the EDocket on the Truck Tablet it is counted in uplift.  EDockets already made are shown in the right hand column.

Codes used to realate to the type of log/ product carting.